Services Performed
Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula.
Update of Design Documentation on production wells by 4030 m depth construction for sites IV (formations TP1 ÷ TP21), V (formations TP4 ÷ TP41) in Juzshno -Tambeyskoye gas-and-condensate field.
Project description
ClientNovateck Yamal LNG
Well kind – directional, with horizontal tail, development;
Total number of wells by the Design – 20;
Well project depth by the vertical, max – 4030 m;
Gas + gas condensate.