Services Performed
«Sakhalin-1» Project. Odoptu Field. Stage 2 of development. North Drill Site. Detailed Design for drilling wells.
Well type:
|
Coast site |
Year:
|
2018 |
Client:
|
Exxon Neftegas Limited |
Prirazlomnoye Oil Field. Arctika-Shelf. Nenets Autonomous Area. Technical design for drilling open-hole sidetracks during well construction at the Prirazlomnoye field.
Well type:
|
offshore |
Year:
|
2017 |
Client:
|
"Gazprom oil shelf" LLC |
«Sakhalin-1» Project. Orlan offshore platform. Batch drilling of wells.
Well type:
|
offshore |
Year:
|
2017 |
Client:
|
Exxon Neftegas Limited |
Reconstruction of a wells group in the Astokh area of the Piltun-Astokhskoye oil and gas condensate field (group 4).
Well type:
|
offshore |
Year:
|
2017 |
Client:
|
Sakhalin Energy |
Well stock reconstruction in the Astokh area of Piltun-Astokhskoye oil and gas condensate field (group 3)
Well type:
|
offshore |
Year:
|
2017 |
Client:
|
Sakhalin Energy |
Nagumanovskoye Gas Field. Orenburg district. Detailed Well Construction Design on 2 wells for Bashkirian deposit in Nagumanovskoye oil and gas field in Orenburg territory.
Well type:
|
onshore |
Year:
|
2016 |
Client:
|
Gazpromviet LLC |
Nagumanovskoye Gas Field. Orenburg district. Detailed Well Construction Design on 9 wells for Artinskian deposit in Nagumanovskoye gas field in Orenburg territory.
Well type:
|
onshore |
Year:
|
2016 |
Client:
|
Gazpromviet LLC |
Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 3550 m depth construction for site IX (formations TP20 ÷ TP26) in Juzshno -Tambeyskoye gas-and-condensate field.
Well type:
|
onshore |
Year:
|
2016 |
Client:
|
Novateck Yamal LNG |
Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 4030 m depth construction for sites IV (formations TP1 ÷ TP21), V (formations TP4 ÷ TP41) in Juzshno -Tambeyskoye gas-and-condensate field.
Well type:
|
onshore |
Year:
|
2016 |
Client:
|
Novateck Yamal LNG |
Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 2900 m depth construction for sites IV (formations TP5+ ÷ TP21), V (formations TP13+ TP14÷TP15) in Juzshno -Tambeyskoye gas-and-condensate field.
Well type:
|
onshore |
Year:
|
2016 |
Client:
|
Novateck Yamal LNG |