OJSC SPA «Burovaya technika»

Services Performed

«Sakhalin-1» Project. Odoptu Field. Stage 2 of development. North Drill Site. Detailed Design for drilling wells.


Well type:
Coast site
Year:
2018
Client:
Exxon Neftegas Limited

Prirazlomnoye Oil Field. Arctika-Shelf. Nenets Autonomous Area. Technical design for drilling open-hole sidetracks during well construction at the Prirazlomnoye field.


Well type:
offshore
Year:
2017
Client:
"Gazprom oil shelf" LLC

«Sakhalin-1» Project. Orlan offshore platform. Batch drilling of wells.


Well type:
offshore
Year:
2017
Client:
Exxon Neftegas Limited

Reconstruction of a wells group in the Astokh area of the Piltun-Astokhskoye oil and gas condensate field (group 4).


Well type:
offshore
Year:
2017
Client:
Sakhalin Energy

Well stock reconstruction in the Astokh area of Piltun-Astokhskoye oil and gas condensate field (group 3)


Well type:
offshore
Year:
2017
Client:
Sakhalin Energy

Nagumanovskoye Gas Field. Orenburg district. Detailed Well Construction Design on 2 wells for Bashkirian deposit in Nagumanovskoye oil and gas field in Orenburg territory.


Well type:
onshore
Year:
2016
Client:
Gazpromviet LLC

Nagumanovskoye Gas Field. Orenburg district. Detailed Well Construction Design on 9 wells for Artinskian deposit in Nagumanovskoye gas field in Orenburg territory.


Well type:
onshore
Year:
2016
Client:
Gazpromviet LLC

Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 3550 m depth construction for site IX (formations TP20 ÷ TP26) in Juzshno -Tambeyskoye gas-and-condensate field.


Well type:
onshore
Year:
2016
Client:
Novateck Yamal LNG

Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 4030 m depth construction for sites IV (formations TP1 ÷ TP21), V (formations TP4 ÷ TP41) in Juzshno -Tambeyskoye gas-and-condensate field.


Well type:
onshore
Year:
2016
Client:
Novateck Yamal LNG

Juzshno-Tambeyskoye Gas-and-Condensate Field. Yamal Peninsula. Update of Design Documentation on production wells by 2900 m depth construction for sites IV (formations TP5+ ÷ TP21), V (formations TP13+ TP14÷TP15) in Juzshno -Tambeyskoye gas-and-condensate field.


Well type:
onshore
Year:
2016
Client:
Novateck Yamal LNG
1 2 3 4 5 6 7 8 9 10 11 12 13