OJSC SPA «Burovaya technika»

Services Performed

Antipayutinskoye Field Development of Group well design on exploratory ##21-24 wells construction of 1100 m depth in Antipayutinskoye field in the Tar Bay water area with the use of FDU “Obsky-1” (Authorial Supervision)


Well type:
offshore
Year:
2011
Client:
"Gazflot LLC"

in Juzshno-Kirinskaya area Development of Individual Well Design on pioneer #1well in Juzshno-Kirinskaya area in the Sea of Okhotsk water area and Authorial Supervision


Well type:
offshore
Year:
2011
Client:
"Gazflot LLC"

Prirazlomnoye Field Adaptation of “Group Well Design on production (development and injection) wells construction in Prirazlomnoye oil field from OISEP” and support in preparing documentation to obtain a positive expert opinion of FSI “Glavgosexpertiza of Russia», “Gazprom VNIIGAZ”, LLC expertise and “Gazprom gazobezopasnost”, LLC expertise.


Well type:
offshore
Year:
2011
Client:
"Gazprom neft shelf"

Kharasoveyskoye Field Development of the Group Well Design on exploratory wells drilling (construction) within the sea section of Kharasoveyskoye field in the Kara Sea water area with the use of SEFDR “AMAZON” (estimates, Drilling Program, support for the design and estimates, Authorial Supervision)


Well type:
offshore
Year:
2011
Client:
"Gazflot LLC"

Juzshno-Kirinskoye Field Development of Individual Well Design on exploratory #2 well in Juzshno-Kirinskoye field in the Sea of Okhotsk water area with the use of SSDU “DOO SUNG” (estimates, Drilling Program, support for the design and estimates, Authorial Supervision)


Well type:
offshore
Year:
2011
Client:
"Gazflot LLC"

Republic of Cuba shelf Development of “The Drilling Program for L-01 pioneer well (block L, the Republic of Cuba shelf)”


Well type:
offshore
Year:
2011
Client:
JSC "Giprovostok-neft"